Outputs | Out Put Description |
Phase-I: Study & Design Phase | |
Output 1:
|
Pre-feasibility study report to facilitate the final selection of sites out of the long list where the consequent project activities will be carried out. This shall involve a summary capture of existing studies/ reports of the subject sites, rapid reconnaissance survey of all sites on the long list, capturing relevant data including population to be served, expected water sources and their suitability, accessibility of options and approximate distances to beneficiary communities, etc. From this rapid study, the consultant will recommend the most appropriate sites for further project works however the final selection of sites will be done by UNICEF/KfW |
Output 2
|
Full feasibility studies (and/or review of existing studies) and report, on the selected project areas; including water resource assessments, demographic assessments, topographical surveys and mapping, delineation of extents of service areas
|
Output 3:
|
Preliminary engineering designs (and/or review of existing designs) for the schemes in the select kebeles and extending as possible to selected adjoining satellite villages. These shall include hydrogeological assessments, socio- economic study (including ability and willingness to pay), water demand analysis, transmission and distribution networks. |
Output 4 | Detailed engineering designs (and/or review of existing designs) for the water supply and sanitation infrastructure-related works, including water and sanitation facilities in institutions (nearby health centres, schools) for the project areas. |
Output 5 | Environmental and social impact assessments (ESIA) and associated environmental and social management plan (ESMP) as per national legal requirements and as per international E&S standards; for each of the water and sanitation schemes. |
Output 6 | Production of tender documents including technical documents from the produced engineering designs (i.e. Detail design report, drawings, bills of quantities and technical specifications). |
Output 7 | Development of business plans and water tariff structures for each scheme |
Phase-II: Construction Supervision | |
Output 8: | Supervision of construction works in the selected intervention towns and adjoining satellite villages. |
Output 9: | Superintendence over the Defects Liability Period and as needed, provide technical assistance to the client bureaus based on the agreed unit rate. |
Oromia is bordered by the Somali Region to the east; the Amhara Region, the Afar Region and the Benishangul-Gumuz Region to the north; Dire Dawa to the northeast; the South Sudanese state of Upper Nile, Gambela Region, Southern Nations, Nationalities, and Peoples’ Region and Sidama Region to the west; the Eastern Province of Kenya to the south; as well as Addis Ababa as an enclave surrounded by Special Zone in its center and the Harari Region as an enclave surrounded by East Hararghe in its east.
All three projects area are located in the Oromia’s Region state of Ethiopia. The selected Kebele to include in the inception and pre-feasibility stage study are Jajo which is found in east Hararge Kumbi Woreda, Kare Tule which is found in east Bale Rayitu Woreda and Dibe Mole which also found in east Bale in Dawe kechen. All Woredas are bordered with Somali Regional State in the East, kumbi Woreda is bordered with Boke Woreda of West Hararge in West, Gola Oda in south & Lega Hidha of east Bale in south direction, Rayitu Woreda is located to the east of Ginnir Woreda, south of Sawena and North of Dawe Kachen. The third project area is Dawe kechen which is found to the east of Goro Woreda of Bale Zone and south of Rayitu.
The locations of the project areas are depicted in the following page. All
the projects are found in the Somali National Reginal State. Barey town is the capital administrative center of Barey Woreda and found in the Afdher Zone. It is about 850 km far from Jigjiga which is the capital city of the regional The Southern part of the woreda is bordered by the Federal State of Somalia.
Shinile town is located in Sitti Zone at a distance of 480 km from AA and 166 km from, Jigjiga.. It is among the woredas of Sitti zones and the capital cities of both zonal and woreda administrations. The town can also be accessible via asphalt roads of, 66 km and 7 km from Harar and Dire Dawa towns respectively. Adadile town is the capital administrative center of Adadile woreda, found in Shebelle Zonal Administration of the Regional State. It can be accessible from Jigjiga city in driving through 552 km long asphalt road to Gode town, then keep driving ahead of 18 km short gravel road up to the project town. Optionally, airplanes can be used up to Gode town
Most areas of the region are characterized by a scarcity of fresh water. The ground water resource is hardly found fresh because of a higher content of dissolved salts in most cases and metals in some cases. There are also few surface water distributions in the region and the scarce resources available cannot be even accessible to most of the urban and rural settlements due its farthest distant from them. Addible is the only closest town to the Shabelle river among others.