Outputs |
Out Put Description |
Phase-I: Study & Design Phase |
Output 1:
|
Pre-feasibility study report to facilitate the final selection of sites out of the long list where the consequent project activities will be carried out. This shall involve a summary capture of existing studies/ reports of the subject sites, rapid reconnaissance survey of all sites on the long list, capturing relevant data including population to be served, expected water sources and their suitability, accessibility of options and approximate distances to beneficiary communities, etc. From this rapid study, the consultant will recommend the most appropriate sites for further project works however the final selection of sites will be done by UNICEF/KfW |
Output 2
|
Full feasibility studies (and/or review of existing studies) and report, on the selected project areas; including water resource assessments, demographic assessments, topographical surveys and mapping, delineation of extents of service areas
|
Output 3:
|
Preliminary engineering designs (and/or review of existing designs) for the schemes in the select kebeles and extending as possible to selected adjoining satellite villages. These shall include hydrogeological assessments, socio- economic study (including ability and willingness to pay), water demand analysis, transmission and distribution networks. |
Output 4 |
Detailed engineering designs (and/or review of existing designs) for the water supply and sanitation infrastructure-related works, including water and sanitation facilities in institutions (nearby health centres, schools) for the project areas. |
Output 5 |
Environmental and social impact assessments (ESIA) and associated environmental and social management plan (ESMP) as per national legal requirements and as per international E&S standards; for each of the water and sanitation schemes. |
Output 6 |
Production of tender documents including technical documents from the produced engineering designs (i.e. Detail design report, drawings, bills of quantities and technical specifications). |
Output 7 |
Development of business plans and water tariff structures for each scheme |
Phase-II: Construction Supervision |
Output 8: |
Supervision of construction works in the selected intervention towns and adjoining satellite villages. |
Output 9: |
Superintendence over the Defects Liability Period and as needed, provide technical assistance to the client bureaus based on the agreed unit rate. |